Make it stand out.

Take a look at our recent projects.

King Edward’s School Gymnasium

Full mechanical and electrical design and build project for an existing school. The project involved the complete strip out and new installation of all MEP to serve the new altered layouts for the corridors, gymnasium, kitchenette, offices and classrooms. New plant, ductwork, containment and fixtures were installed to meet the clients requirements with full design, installation and commissioning carried out by the RPE teams.

Brixton House

Full electrical installation on refurbed London 5 storey office block consisting of 26 large offices and communal areas. The building was stripped back to red brick and a full electrical installation carried out in galvanised metalwork to remain on show throughout.

Holbrook Primary School

Full mechanical and electrical installation of a new build primary school block consisting of 7 individual classrooms, WC block and office facilities. New ASHP’s were installed to provide heating and hot water throughout with new electrical, fire detection and data networking installed on this full design and build project.

The Stonehenge Secondary School

The Stonehenge school project was a new build 2-storey teaching block which RPE carried out the full electrical installation package for Wiltshire council.

Longvernal Primary School

Adaption and addition works to the existing mechanical and electrical installation were required for this extension and alteration for the existing school. Working with the construction company this project was turned around and ready for the reopening of the school after the summer holidays.

Nables Farm Holiday Cottages

This exquisite build required the combination of our commercial and domestic teams to work together to create an exceptional and unique finish. Our commercial team had to install major sub main distribution and completion of multiple plant rooms whilst the domestic team carefully brought our clients visions to life.

Supermarket Production Installation

A bespoke addition to an already thriving client of ours, comprising of the installation of two new 200A compressors, new distribution equipment, sub main distribution and a large number of new small power and lighting final circuits. This project required the RPE industrial team to install a large amount of containment to suit all requirements of new plant and conveyor equipment as well as small power and lighting to the newly constructed rooms to mm perfect detail.

The Arc Climbing Centre

RPE oversaw and project managed full M&E installation of this new build climbing centre. All electrical and mechanical aspects were to be on show upon completion of this project allowing the fine details of this installation to be appreciated by all.

Looking for our help?

Our friendly team would love to hear from you!